This is a real HomeGyan inspection report, published with the homeowner's privacy protected. Every finding, photograph and measurement is exactly as recorded on site. Only the identifying details β€” owner name, unit number, project name, builder and street address β€” have been replaced.

Book your inspection β€” from β‚Ή5,999
HomeGyan.INSPECTION YOU CAN TRUST
Inspection You Can Trust
Report #SMPLGXM9YR
Property

Apartment Handover in Bengaluru

123 Β· Bengaluru

Inspection Date
September 2026
Client
Private Homeowner
Inspector ID
HG-CERTIFIED
Builder
Ashoka Residency
Floor Area
1,203 sq ft
Defect Summary
0
Major
32
Attention
11
Minor
167
Satisfactory
β„Ή 43 issue(s) noted β€” 32 to watch, 11 minor. Raise the minor ones in your snagging list with the builder.
How to read this report
MajorAffects the structure, your safety, or a system the home depends on β€” water, power, drainage or waterproofing. Get these rectified in writing before you accept handover or release the final payment: they are the hardest and most expensive things to fix once you have moved in.
MinorA workmanship or finish defect β€” the home is sound, but the work is not to the standard you paid for. These belong on your snag list for the builder to close out. Nearly every new home has some.
AttentionNot a defect today, but something to watch or act on early β€” a reading near its limit, wear that will progress, or a component missing that you will want later. Cheap to address now, costly to ignore.
SatisfactoryWe inspected this and found nothing wrong with it. A high satisfactory count is the reassurance the report is meant to give you β€” it is the evidence of what was checked, not padding.
Not presentThe component is not fitted at this property, so there was nothing to inspect. Deliberately not counted as a defect β€” but still recorded, so you can tell it apart from a checkpoint we simply did not reach.
Scope of Inspection

New Apartment Handover Inspection

How to Read This Report

Walls and quadrants are numbered the same way in every room, so a defect can be found again from the report alone β€” including by a contractor who was not present at the inspection.

Wall numbering
Room seen from above
1234↑ YOU ENTER HERE
1
Entry wall β€” The wall the door is in β€” the one at your back as you step into the room.
2
Left wall β€” On your left as you stand in the doorway looking into the room.
3
Opposite wall β€” The wall facing you from across the room, opposite the entry wall.
4
Right wall β€” On your right as you stand in the doorway looking into the room.
Quadrant numbering
A single wall, seen head-on
1234AS YOU FACE THE WALL
1
Top right β€” Upper half of the wall, right-hand side.
2
Bottom right β€” Lower half, right-hand side β€” skirting to mid-height.
3
Bottom left β€” Lower half, left-hand side β€” skirting to mid-height.
4
Top left β€” Upper half of the wall, left-hand side.
Moisture readings (WME %)
Concrete, plaster and drywall
Dry
Under 15%
Elevated
15% to 19%
Actively wet
20% and above
Under 15%Dry. Within normal baseline levels for the material. No action needed.
15% to 19%Elevated. Moisture is present. This is the at-risk band β€” it warrants closer monitoring.
20% and aboveActively wet. Strongly indicates a leak, active seepage, or a severe condensation problem.

Moisture meters report a WME (wood moisture equivalent) percentage. On concrete, plaster and drywall that figure is not an absolute water content β€” it is read on a relative scale to judge whether a surface is dry, at risk, or actively wet.

Priority Findings (43)
Recommended to fixEntry, Foyer, Living & Dining
Main door frame alignment and closing
Main door frame slightly missaligned. Crack between door frame and wall - Need better caulking or sealing.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
Recommended to fixEntry, Foyer, Living & Dining
Living room wall and paint finish
Uneven paint finishing at the corner of the balcony and living room - The right corner. See attached image.
Why this matters: Uneven putty, thin coverage and patchy touch-up marks are visible under any raking light, and they are the finish the owner looks at every day. Paint applied over a surface that was not properly prepared also lifts early, so the defect returns rather than wearing out.
Putting it right: The surface is rubbed back, putty made good and levelled, and the affected area recoated in full β€” wall to wall rather than in patches, because a spot-coat shows as a patch whatever the colour match.
How to fix this β†’
Recommended to fixEntry, Foyer, Living & Dining
Living/dining window glazing and seal
The balcony door has an uneven finish from the outside. The window close to main door has a screw cap is missing from the frame.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
Recommended to fixBedroom 2 / Guest Bedroom
Door shutter, latch and stopper
1. Uneven gap observed between door and door frame 2. Handle auto lock not working.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
Recommended to fixBedroom 3 / Guest Bedroom
Floor level, joints and skirting
Scratches observed at multiple tiles: R1C3, R1C4, R1C5, R2C4, R3C6, R4C1, R4C6
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
Photo 1
Recommended to fixBedroom 3 / Guest Bedroom
Door shutter, latch and stopper
Handle auto lock not working.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
Recommended to fixGuest Bathroom
Floor slope towards drain
Faulty Drainage in common bathroom. The slope needs to be checked for proper drainage.
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
Recommended to fixGuest Bathroom
Floor trap, grating and drainage speed
Slow drainage - needs checking. Hollowness observed at the floor tile near drain
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
Recommended to fixGuest Bathroom
Wall tile alignment and grouting
Wall 1 - The entry wall -One with the door Wall 2 - The Left wall Wall 3 - The wall opposite to entry wall Wall 4 - The right wall. Quadrant 1 is the right top of the wall Quadrant 2 is the right bottom of the wall Quadrant 3 is the left bottom of the wall Quadrant 4. is the left top o 1. Hollowness observed at Wall 4 - (Quadrant 3 tiles) f the wall 2. Uneven tile observed at Wall 4 quadrant 3 3. Dado tile chip-off observed at Wall 2 quadrant 3
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
Recommended to fixMaster Bathroom
Bathroom False Ceiling
False Ceiling channel needs to be fixed.
Why this matters: A false ceiling that is poorly levelled or inadequately supported sags visibly along its joints, and the boards crack at the corners as it moves. It is also the first thing to show any leak from the slab above it.
Putting it right: The suspension is re-levelled and additional hangers added where the spans are too long, then joints are re-taped, finished and repainted.
How to fix this β†’
Recommended to fixElectrical Systems
Every switch, regulator and dimmer
Hall Wall 3 wall point is not working.
Why this matters: Electrical defects do not improve on their own, and the ones that matter are invisible until something is plugged in: a point wired with reversed polarity, a circuit with no earth continuity, or a residual-current device that does not trip when tested.
Putting it right: Each affected point or circuit is retested, and the wiring, polarity, earthing or protective device corrected at the distribution board or at the point itself. Retesting after the work is what closes it out, not the repair.
Workmanship for this trade is governed by IS 732 (electrical wiring installations) and IS 3043 (earthing).
How to fix this β†’
MonitorEntry, Foyer, Living & Dining
Door viewer, calling bell and intercom
Door Viewer not installed. Only hole provided. Calling bell and intercom not inspected.
Why this matters: Electrical defects do not improve on their own, and the ones that matter are invisible until something is plugged in: a point wired with reversed polarity, a circuit with no earth continuity, or a residual-current device that does not trip when tested.
Putting it right: Each affected point or circuit is retested, and the wiring, polarity, earthing or protective device corrected at the distribution board or at the point itself. Retesting after the work is what closes it out, not the repair.
Workmanship for this trade is governed by IS 732 (electrical wiring installations) and IS 3043 (earthing).
How to fix this β†’
MonitorEntry, Foyer, Living & Dining
Foyer flooring, skirting and niche finish
Hollowness observed at the below places: Attn: R - Row , C - Column R4C2 = Row 4 and Column 2. R4 C2 R6 4C R10 C1 R11 C5 R12 C1 Crack observed at R4 C3
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorEntry, Foyer, Living & Dining
Living area switchboards and socket points
The electrical light point above the switchboard, which is attached to the balcony wall is not working.
Why this matters: Electrical defects do not improve on their own, and the ones that matter are invisible until something is plugged in: a point wired with reversed polarity, a circuit with no earth continuity, or a residual-current device that does not trip when tested.
Putting it right: Each affected point or circuit is retested, and the wiring, polarity, earthing or protective device corrected at the distribution board or at the point itself. Retesting after the work is what closes it out, not the repair.
Workmanship for this trade is governed by IS 732 (electrical wiring installations) and IS 3043 (earthing).
How to fix this β†’
MonitorKitchen
Kitchen counter level and slope
Kitchen counter not provided.
Why this matters: Common-area and safety provisions are what the building relies on when something goes wrong, so a defect here is only discovered at the worst possible moment.
Putting it right: The item is repaired or provided to the approved specification for the building and retested on completion.
How to fix this β†’
MonitorKitchen
Counter slab joints, edge polish and overhang
Kitchen counter/slab not provided.
Why this matters: Common-area and safety provisions are what the building relies on when something goes wrong, so a defect here is only discovered at the worst possible moment.
Putting it right: The item is repaired or provided to the approved specification for the building and retested on completion.
How to fix this β†’
MonitorKitchen
Dado tiling and sealant quality
Dado tile yet to be installed
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
Photo 1Photo 2
MonitorKitchen
Gas pipeline / PNG-LPG point safety
Gas connection not provided
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
MonitorKitchen
Kitchen window, mesh and ventilation
Mosquito mess not installed. Provision to install is available.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 1 / Master Bedroom
Wall surface and paint finish
Minor crack found in Wall one - the wall with the door is wall one. The crack is touched up with paint, looks like a cosmetic issue not structural. Check with builder once.
Why this matters: Uneven putty, thin coverage and patchy touch-up marks are visible under any raking light, and they are the finish the owner looks at every day. Paint applied over a surface that was not properly prepared also lifts early, so the defect returns rather than wearing out.
Putting it right: The surface is rubbed back, putty made good and levelled, and the affected area recoated in full β€” wall to wall rather than in patches, because a spot-coat shows as a patch whatever the colour match.
How to fix this β†’
MonitorBedroom 1 / Master Bedroom
Flooring finish and skirting line
Wall skirting needs to have a better finish. Better caulking or sealing needed.
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorBedroom 1 / Master Bedroom
Window grill / safety mesh
Window grill/safety mesh not installed. Mosquito net provision provided, but not installed.
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 1 / Master Bedroom
Bedroom door, latch and privacy lock
Master bedroom handle door not auto locking
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 2 / Guest Bedroom
Wall and ceiling paint finish
Wall crack observed at corner of wardrobe area. Right above the hollow tile. This looks cosmetic. But good to check with builder once.
Why this matters: Uneven putty, thin coverage and patchy touch-up marks are visible under any raking light, and they are the finish the owner looks at every day. Paint applied over a surface that was not properly prepared also lifts early, so the defect returns rather than wearing out.
Putting it right: The surface is rubbed back, putty made good and levelled, and the affected area recoated in full β€” wall to wall rather than in patches, because a spot-coat shows as a patch whatever the colour match.
How to fix this β†’
MonitorBedroom 2 / Guest Bedroom
Floor level, joints and skirting
1. Hollowness observed at R4 C3 2. Uneven tile observed at R1C1, R2C1 3. Tile chip-off observed at R6C5
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorBedroom 2 / Guest Bedroom
Window shutters, mesh and latch
1. Mosquito mess provision available but not provided. 2. Screw cap not provided for window frame
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 2 / Guest Bedroom
Window grill / safety mesh
Window grill not provided
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 3 / Guest Bedroom
Ceiling finish and false ceiling edges
Uneven cement work in the outside ceiling finish.
Why this matters: A false ceiling that is poorly levelled or inadequately supported sags visibly along its joints, and the boards crack at the corners as it moves. It is also the first thing to show any leak from the slab above it.
Putting it right: The suspension is re-levelled and additional hangers added where the spans are too long, then joints are re-taped, finished and repainted.
How to fix this β†’
MonitorBedroom 3 / Guest Bedroom
Window shutters, mesh and latch
Mosquito net provision available but not installed/provided
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBedroom 3 / Guest Bedroom
Window grill / safety mesh
Window grill not provided
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorGuest Bathroom
Taps, mixers and shower leakage
Tap not provided yet in the common bathroom
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
MonitorGuest Bathroom
Bathroom False Ceiling
False Ceiling channel needs to be fixed properly
Why this matters: A false ceiling that is poorly levelled or inadequately supported sags visibly along its joints, and the boards crack at the corners as it moves. It is also the first thing to show any leak from the slab above it.
Putting it right: The suspension is re-levelled and additional hangers added where the spans are too long, then joints are re-taped, finished and repainted.
How to fix this β†’
MonitorMaster Bathroom
Floor slope towards drain
Water storage observed near drainage. Needs a better sloping.
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorMaster Bathroom
Wall tile alignment and grouting
1. Hollowness observed at the tile near drain. 2. Hollowness observed at dado tile wall 1 quadrant 4 3. Hollowness observed at dado tile wall 3 quadrant 2
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorMaster Bathroom
Taps, mixers and shower leakage
Tap not provided
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
MonitorMaster Bathroom
Shower zone slope, ledge and partition
Slope drainage slow. Needs checking!
Why this matters: Common-area and safety provisions are what the building relies on when something goes wrong, so a defect here is only discovered at the worst possible moment.
Putting it right: The item is repaired or provided to the approved specification for the building and retested on completion.
How to fix this β†’
MonitorMaster Bathroom
Bathroom door, threshold and lock
Gap between door frame and the wall need to be filled properly
Why this matters: Doors, windows and shutters that are out of plumb or badly gapped do not seal. They let in dust and noise, bind or rattle as the frame moves with the seasons, and the ironmongery wears quickly because it is taking load it was not meant to.
Putting it right: The frame is re-plumbed or re-fixed, gaps brought back within tolerance, and the hardware adjusted or replaced. Where the frame itself has swollen or split it is the frame that needs changing, not the shutter.
Workmanship for this trade is governed by IS 4021 (door and window frames).
How to fix this β†’
MonitorBalconies & Railings
Balcony floor slope and drain outlet
Water drainage not working as expected. Water logging see close to railings wall.
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorBalconies & Railings
Balcony floor tile
1. Crack tile found near drain outlet. The tile is attached to the railing wall 2. Hollowness observed at balcony R4C3 3. Uneven tile observed at balcony R9C2, R9C3
Why this matters: Tiles laid without a full bed of mortar beneath them sound hollow and work loose over time. The grout lines fail first, then water gets into the bedding, and the tile eventually cracks or lifts underfoot.
Putting it right: The affected tiles are lifted, the bedding mortar made good to a full bed, and the tiles re-laid and re-grouted. Patching only the worst tile tends to recur, because the neighbouring bedding is usually no better.
Workmanship for this trade is governed by IS 15622 (pressed ceramic tiles).
How to fix this β†’
MonitorElectrical Systems
Distribution board labelling and MCBs
MCB labelling has to be done.
Why this matters: Electrical defects do not improve on their own, and the ones that matter are invisible until something is plugged in: a point wired with reversed polarity, a circuit with no earth continuity, or a residual-current device that does not trip when tested.
Putting it right: Each affected point or circuit is retested, and the wiring, polarity, earthing or protective device corrected at the distribution board or at the point itself. Retesting after the work is what closes it out, not the repair.
Workmanship for this trade is governed by IS 732 (electrical wiring installations) and IS 3043 (earthing).
How to fix this β†’
MonitorPlumbing & Water Supply
Water quality: TDS, hardness and odour
Hard water observed. TDS over 500.
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
MonitorPlumbing & Water Supply
Drainage flow and standing water
Found issues in bathrooms and balcony
Why this matters: A leaking or badly fitted plumbing item wastes water continuously and wets the structure around it. Inside a wall or under a sunk slab it can run for months before it shows, and by then the damage is to the finishes rather than to the fitting.
Putting it right: The fitting, joint or run is reworked and tested under pressure, and any wet area it has reached is dried and made good once the leak has been proven stopped.
Workmanship for this trade is governed by IS 1172 (water supply, drainage and sanitation) and NBC 2016 Part 9.
How to fix this β†’
MonitorStructural, Dampness & Water Leakage
Area measurement
Very very minute area measurement difference. So all good here.
Why this matters: Damp that is already visible has been travelling through the wall or slab for some time. Left alone it lifts paint and putty, blows the plaster, corrodes any reinforcement it reaches, and reappears a short distance away after each monsoon.
Putting it right: The source of the water is traced first β€” a failed membrane, a blocked outlet, a cracked joint or an adjoining wet area β€” and treated at that point. Re-plastering or repainting over damp hides it for one season and no longer.
Workmanship for this trade is governed by IS 2645 (integral waterproofing compounds) and NBC 2016.
How to fix this β†’
Full Inspection Checklist
Entry, Foyer, Living & Dining
6 issues11 ok
CheckpointStatusInspector Comment
Main door frame alignment and closing
Recommended to fixMain door frame slightly missaligned. Crack between door frame and wall - Need better caulking or sealing.
Main door lock
OKβ€”
Door viewer, calling bell and intercom
MonitorDoor Viewer not installed. Only hole provided. Calling bell and intercom not inspected.
Foyer flooring, skirting and niche finish
MonitorHollowness observed at the below places: Attn: R - Row , C - Column R4C2 = Row 4 and Column 2. R4 C2 R6 4C R10 C1 R11 C5 R12 C1 Crack observed at R4 C3
Living room wall and paint finish
Recommended to fixUneven paint finishing at the corner of the balcony and living room - The right corner. See attached image.
Living room wall plumb and squareness
OKVisual inspection looked okay.
Wall plaster flatness
OKβ€”
Living/dining flooring level and joints
OKβ€”
Skirting alignment and floor junction
OKβ€”
False ceiling and edge finishing
OKFalse ceiling not installed. So, not inspected
Ceiling soffit cracks and patch marks
OKβ€”
Living area switchboards and socket points
MonitorThe electrical light point above the switchboard, which is attached to the balcony wall is not working.
TV, internet and AC point provision
OKVisual inspection looked okay. Points provided and checked.
Light points, [redacted] lighting and fan hook
OKNot applicable. Visually inspected - No lights were installed.
Living/dining window glazing and seal
Recommended to fixThe balcony door has an uneven finish from the outside. The window close to main door has a screw cap is missing from the frame.
Curtain rod blocking above windows
OKNot provided/inspected
Dining wash basin, tap and drain
OKNot provided
Kitchen
5 issues11 ok
CheckpointStatusInspector Comment
Kitchen counter level and slope
MonitorKitchen counter not provided.
Counter slab joints, edge polish and overhang
MonitorKitchen counter/slab not provided.
Cabinet shutter alignment and hinges
OKNot yet installed
Cabinet internals, drawers and channels
OKNot yet installed
Sink trap and under-sink leakage
OKNot yet installed
Sink bowl fixing and drain board slope
OKNot yet installed
Hot and cold inlet points with angle valves
OKβ€”
Dado tiling and sealant quality
Photo 1Photo 2
MonitorDado tile yet to be installed
Gas pipeline / PNG-LPG point safety
MonitorGas connection not provided
Chimney duct, exhaust outlet and hob cutout
OKNot yet installed
Kitchen power points and RCD protection
OKInspected - all okay
Water purifier point and drain
OKVisually inspected - Point provided. Not installed.
Kitchen floor level
OKβ€”
Kitchen window, mesh and ventilation
MonitorMosquito mess not installed. Provision to install is available.
Loft slab, shutters and access
OKNot inspected
Fittings brand/model matches builder specification
OKNot inspected - no fittings installed yet. Builder specification not provided.
Utility & Service Area
9 ok
CheckpointStatusInspector Comment
Utility area plumbing/electrical points
OKChecked plumbing and electrical points within kitchen. Everything looked okay.
Washing machine inlet, drain and power
OKProvision provided - All electrical work looks good.
Utility floor slope to drain
OKNot applicable.
Utility sink, tap and waste connection
OKAddressed within kitchen area.
Water inlet line, meter and shutoff
OKNot applicable
LPG cylinder space and ventilation
OKNot applicable as utility section is not available.
Cloth drying provision
OKNot applicable as utility section is not available.
Utility door, mesh shutter and lock
OKNot applicable as utility section is not available.
Utility waterproofing and adjoining wall
OKNot applicable as utility section is not available.
Bedroom 1 / Master Bedroom
4 issues10 ok
CheckpointStatusInspector Comment
Wall surface and paint finish
MonitorMinor crack found in Wall one - the wall with the door is wall one. The crack is touched up with paint, looks like a cosmetic issue not structural. Check with builder once.
Flooring finish and skirting line
MonitorWall skirting needs to have a better finish. Better caulking or sealing needed.
Skirting gaps and corner mitres
OKβ€”
Ceiling and cornice finish
OKβ€”
Wardrobe shutters and internal fitment
OKNot applicable
Wardrobe shelves, drawers and hanging rod
OKNot applicable
Window operation and weather seal
OKβ€”
Window grill / safety mesh
MonitorWindow grill/safety mesh not installed. Mosquito net provision provided, but not installed.
Switchboards, sockets and AC point
OKβ€”
AC sleeve, drain slope and outdoor unit space
OKβ€”
TV, telephone and data points
OKβ€”
Bedroom door, latch and privacy lock
MonitorMaster bedroom handle door not auto locking
Attached bathroom door and water barrier
OKβ€”
Balcony door, threshold and water stop
OKNot Applicable
Bedroom 2 / Guest Bedroom
5 issues5 ok
CheckpointStatusInspector Comment
Wall and ceiling paint finish
MonitorWall crack observed at corner of wardrobe area. Right above the hollow tile. This looks cosmetic. But good to check with builder once.
Floor level, joints and skirting
Monitor1. Hollowness observed at R4 C3 2. Uneven tile observed at R1C1, R2C1 3. Tile chip-off observed at R6C5
Ceiling finish and false ceiling edges
OKCeiling checked, False ceiling not applicable.
Door shutter, latch and stopper
Recommended to fix1. Uneven gap observed between door and door frame 2. Handle auto lock not working.
Window shutters, mesh and latch
Monitor1. Mosquito mess provision available but not provided. 2. Screw cap not provided for window frame
Window grill / safety mesh
MonitorWindow grill not provided
Wardrobe provision and fitment
OKNot Applicable
Power points and light fixtures
OKβ€”
AC point, sleeve and drain
OKβ€”
TV and data points
OKβ€”
Bedroom 3 / Guest Bedroom
5 issues5 ok
CheckpointStatusInspector Comment
Wall and ceiling paint finish
OKNo issues observed
Floor level, joints and skirting
Photo 1
Recommended to fixScratches observed at multiple tiles: R1C3, R1C4, R1C5, R2C4, R3C6, R4C1, R4C6
Ceiling finish and false ceiling edges
MonitorUneven cement work in the outside ceiling finish.
Door shutter, latch and stopper
Recommended to fixHandle auto lock not working.
Window shutters, mesh and latch
MonitorMosquito net provision available but not installed/provided
Window grill / safety mesh
MonitorWindow grill not provided
Wardrobe provision and fitment
OKNot applicable as wardrobe not installed.
Power points and light fixtures
OKβ€”
AC point, sleeve and drain
OKβ€”
TV and data points
OKβ€”
Guest Bathroom
5 issues17 ok
CheckpointStatusInspector Comment
Floor slope towards drain
Recommended to fixFaulty Drainage in common bathroom. The slope needs to be checked for proper drainage.
Floor trap, grating and drainage speed
Recommended to fixSlow drainage - needs checking. Hollowness observed at the floor tile near drain
Wall tile alignment and grouting
Recommended to fixWall 1 - The entry wall -One with the door Wall 2 - The Left wall Wall 3 - The wall opposite to entry wall Wall 4 - The right wall. Quadrant 1 is the right top of the wall Quadrant 2 is the right bottom of the wall Quadrant 3 is the left bottom of the wall Quadrant 4. is the left top o 1. Hollowness observed at Wall 4 - (Quadrant 3 tiles) f the wall 2. Uneven tile observed at Wall 4 quadrant 3 3. Dado tile chip-off observed at Wall 2 quadrant 3
Tile joint width, grout and cut placement
OKβ€”
Taps, mixers and shower leakage
MonitorTap not provided yet in the common bathroom
CP fittings brand/model match specification
OKβ€”
Health faucet, angle valve and fixing
OKβ€”
WC fixing, seat and flush operation
OKβ€”
Wash basin, counter, waste and trap
OKβ€”
Sanitaryware free from chips, cracks and stains
OKβ€”
Under-counter basin support and fixing
OKβ€”
Bottle trap, angle cock and connection hoses
OKβ€”
Shower zone slope, ledge and partition
OKβ€”
Exhaust fan and geyser point
OKβ€”
Geyser dedicated MCB and clearance
OKβ€”
Exhaust duct termination and shaft
OKβ€”
Water pressure and flow at all outlets
Photo 1
OKWater pressure as per standard specifications - between 1.5 to 5. Observed 3 kg/cm2
Mirror, shelf and accessory fixing
OKNot applicable
Bathroom door, threshold and lock
OKβ€”
Concealed plumbing access panel
OKβ€”
Signs of waterproofing failure
OKβ€”
Bathroom False Ceiling
MonitorFalse Ceiling channel needs to be fixed properly
Master Bathroom
6 issues16 ok
CheckpointStatusInspector Comment
Floor slope towards drain
MonitorWater storage observed near drainage. Needs a better sloping.
Floor trap, grating and drainage speed
OKβ€”
Wall tile alignment and grouting
Monitor1. Hollowness observed at the tile near drain. 2. Hollowness observed at dado tile wall 1 quadrant 4 3. Hollowness observed at dado tile wall 3 quadrant 2
Tile joint width, grout and cut placement
OKβ€”
Taps, mixers and shower leakage
MonitorTap not provided
CP fittings brand/model match specification
OKβ€”
Health faucet, angle valve and fixing
OKβ€”
WC fixing, seat and flush operation
OKβ€”
Wash basin, counter, waste and trap
OKβ€”
Sanitaryware free from chips, cracks and stains
OKβ€”
Under-counter basin support and fixing
OKβ€”
Bottle trap, angle cock and connection hoses
OKβ€”
Shower zone slope, ledge and partition
MonitorSlope drainage slow. Needs checking!
Exhaust fan and geyser point
OKβ€”
Geyser dedicated MCB and clearance
OKβ€”
Exhaust duct termination and shaft
OKβ€”
Water pressure and flow at all outlets
OKβ€”
Mirror, shelf and accessory fixing
OKβ€”
Bathroom door, threshold and lock
MonitorGap between door frame and the wall need to be filled properly
Concealed plumbing access panel
OKβ€”
Signs of waterproofing failure
OKβ€”
Bathroom False Ceiling
Recommended to fixFalse Ceiling channel needs to be fixed.
Balconies & Railings
2 issues9 ok
CheckpointStatusInspector Comment
Balcony floor slope and drain outlet
MonitorWater drainage not working as expected. Water logging see close to railings wall.
Balcony floor tile and anti-skid finish
OKβ€”
Railing fixing and height
OKβ€”
Railing height and baluster gap
OKβ€”
Glass railing marking and fixing
OKβ€”
Balcony door threshold and water stop
OKβ€”
Balcony soffit, drip mould and paint
OKβ€”
Parapet wall finish and coping
OKβ€”
Balcony light point and weatherproofing
OKβ€”
Seepage into the adjoining room
OKβ€”
Balcony floor tile
Monitor1. Crack tile found near drain outlet. The tile is attached to the railing wall 2. Hollowness observed at balcony R4C3 3. Uneven tile observed at balcony R9C2, R9C3
Door Frames, Shutters & Hardware
14 ok
CheckpointStatusInspector Comment
Door frames: material, plumb and finish
OKβ€”
Frame free of cracks and open internal joints
OKDoor frame crack observed in main door. Already discussed in Living area section.
No gap between frame, beading/architrave and wall
OKMaster bedroom door alignment issue between door and frame. Already discussed in Bedroom1 /Master bedroom
Frame, beading and architrave undamaged
OKβ€”
No gap between frame and finished floor
OKMaster bedroom door has an uneven gap.
Lock receiving (strike) plate fixed
OKβ€”
Door shutter perimeter gap
OKβ€”
Shutter free from chips, scratches and cracks
OKβ€”
Hinges, handles, bolts and stoppers
OKβ€”
Hinge screws complete and rust-free
OKβ€”
Lock, handle and tower bolt operate smoothly
OKAuto locking not working as expected in bedroom. Highlighted in all bedroom sections.
Doors operate easily and noiselessly
OKβ€”
Shutter warping, swelling or delamination
OKβ€”
Veneer/laminate polish finish
OKβ€”
Windows, Sliding Doors & Glazing
14 ok
CheckpointStatusInspector Comment
Window frame external sealant
OKβ€”
Frame corner joints free of gaps
OKβ€”
Sliding rollers, track and locking
OKβ€”
Sealing felt (brush pile) fitted in the frame
OKβ€”
Drain (weep) holes in the bottom track
OKβ€”
Sliding stopper and hook lock on every shutter
OKβ€”
Handle fitted and lock operating smoothly
OKβ€”
Shutter free from breakage, scratches or cracks
OKβ€”
Glass thickness, beading and scratches
OKβ€”
Rubber glazing gasket fixed properly
OKβ€”
Glass cleaned of cement, paint and stickers
OKβ€”
Mosquito mesh shutters, fit and damage
OKNot Applicable as its not installed.
External sill slope and drip
OKβ€”
Rain water ingress test
OKNot inspected.
Electrical Systems
2 issues19 ok
CheckpointStatusInspector Comment
Distribution board labelling and MCBs
MonitorMCB labelling has to be done.
Circuit diagram provided at the flat DB
Photo 1
OKβ€”
MCB ratings and circuit separation
Photo 1
OKβ€”
Earthing and RCD/RCCB function
OKβ€”
Earth resistance measurement
OKβ€”
RCCB/ELCB trip test
OKβ€”
Line-neutral polarity at sockets
OKβ€”
Socket and switch count per room
OKβ€”
Every switch, regulator and dimmer
Recommended to fixHall Wall 3 wall point is not working.
Switch and [redacted]r plates fixed properly
OKNo issues observed
Switch plates aligned horizontally
OKNo issues observed
Fan regulator fitted on the switch plate
OKNo issues observed
Gaps and mould around the DB and switch boxes
OKNo issues observed
Dummy/blank plates on unused boxes
OKβ€”
Concealed wiring, conduit and junction boxes
OKβ€”
Light fixtures, fans and fixing
OKNot applicable
Surge protection device at the DB
OKNo issues observed
Inverter/UPS and DG backup circuit
OKβ€”
BESCOM meter and sanctioned load
OKNot inspected
TV, telephone and internet cabling
OKβ€”
Fire safety and emergency egress
OKNot inspected
Plumbing & Water Supply
2 issues12 ok
CheckpointStatusInspector Comment
Plumbing pressure test evidence
Photo 1
OKWater pressure is normal
Water source: Cauvery/BWSSB and borewell
OKNot inspected
Water quality: TDS, hardness and odour
MonitorHard water observed. TDS over 500.
Overhead tank, level indicator and access
OKNot inspected
Underground sump capacity and [redacted]r
OKNot Inspected
Individual water meter
OKNot Inspected
Booster/hydro-pneumatic pump operation
OKNot inspected
Main and zone shutoff valves
OKAs per standard specifications
Hot water line insulation and routing
OKNo issues observed
Drainage flow and standing water
MonitorFound issues in bathrooms and balcony
Sewage connection to STP or BWSSB main
OKNot Inspected
Rainwater harvesting system
OKNot Inspected
Solar water heater provision
OKNot Inspected
Concealed pipe leak scan
Photo 1
OKNo issues observed
Structural, Dampness & Water Leakage
1 issue15 ok
CheckpointStatusInspector Comment
Crack width classification
OKTwo cosmetic cracks observed. Discussed in previous sections.
Beam-column junction and honeycombing
OKNo issues observed
Slab soffit deflection or sagging
OKNo issues observed
Cracks at lintel and sill level
OKNo issues observed
Plaster hollowness by tapping
OKNo issues observed
Floor flatness under a straightedge
OKNo issues observed
Tile hollow sound and lippage
OKTile hollows found. Discussed in other sections above.
Wall moisture meter readings
OKNo issues observed
Ceiling water stains and efflorescence
OKNo issues observed
Seepage on walls shared with neighbours
OKNot applicable. Couldn't check the seepage from floor above.
External wall rain penetration
OKNot applicable - But not plaster cracks found.
Wet area pond test
OKNot applicable
Sunk slab filling and waterproofing
OKNot applicable
Terrace waterproofing above the unit
OKNot applicable
Thermal imaging scan
Photo 1Photo 2Photo 3Photo 4Photo 5Photo 6Photo 7Photo 8
OKNo dampness or leakage observed via thermal scans.
Area measurement
MonitorVery very minute area measurement difference. So all good here.
HomeGyan.INSPECTION YOU CAN TRUST
Report ID: SMPLGXM9YR
Generated: 1 November 2026
homegyan.com Β· admin.homegyan@gmail.com Β· +91 7975372940
Certification
This report was prepared by a certified HomeGyan field engineer following professional inspection standards. Findings represent conditions observed at the time of inspection only.
Β© 2026 HomeGyan Property Inspections. All rights reserved. This report was prepared for the named client and may be shared with their builder, legal or financial advisers. Reproduction, redistribution or resale in whole or in part, by any party, without written permission from HomeGyan Property Inspections is prohibited.

Yours goes further than this one

This is one home's report β€” and a trimmed one, since anonymising it stripped things your copy keeps. Yours is written as we walk your property: every room in your layout assessed on its own, only the checkpoints that apply to it, each defect photographed where we found it. It arrives with a plain-English summary of what the findings mean, a repair cost estimate, and β€” where the defects warrant it β€” a RERA rectification notice ready to send your builder. 200+ checkpoints, thermal imaging included, within 24 hours of the visit.

Β© 2026 HomeGyan Property Inspections. All rights reserved. This sample report, its layout, findings and photographs are the property of HomeGyan Property Inspections and are published for prospective customers to read. Reproduction or republication, in whole or in part, without written permission is prohibited.

Apartment Handover in Bengaluru β€” Sample Report | HomeGyan